MARINE NOTICE No 09 of 2020
ROYAL CANAL
NEWCOMEN BRIDGE LIFT DATES 2020
Waterways Ireland wishes to advise that the provisional schedule of bridge lift dates 2020 for Newcomen Bridge, Royal Canal, Dublin is as follows:
Date Day of Week Time
16th April Thursday 11am – 1pm
3rd May Sunday 9am – 1pm
30th May Saturday 9am – 1pm
11th June Thursday 11am – 1pm
26th June Friday 11am – 1pm
28th July Tuesday 11am – 1pm
25th August Tuesday 11am – 1pm
24th September Thursday 11am – 1pm
NOTES:
- Arrangements have been made for Iarnród Éireann to open the bridge on the above dates / times, if there is demand.
- Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or dublincanals@waterwaysireland.org ) require 2 weeks’ notice from boaters for use of these lifts. Should there not be a demand (min 2 boats) for a particular date, Iarnród Éireann will be notified by WI that the scheduled lift is cancelled.
- A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.
- On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.
Patrick Harkin
Inspector of Navigation
12 Feb 2020